Archaeologists at
work |
 |
Constructing the
base steel work |
 |
Base steel work
completed |
 |
Base completed |
|
Wind Farm Stats |
No. of turbines:
7 |
Turbine Supplier:
Vestas |
Total Capacity:
14MW |
at wind speeds ≥
10m/sec |
Hub height: 80
metres |
Rotor dia:
90 metres |
Tip height: 125
metres |
|
Petsoe Manor Wind Turbines
(Milton Keynes Wind Farm) |
The
nacelle arrives on site for No.4 wind turbine. |
In the background are two of the tower sections and the hub |
 |
Erecting the
tower and the nacelle |
 |
A blade arrives |
|
|
|